Mike Hickey
We installed a 62K solar field at the Knights of Columbus in Murphysboro. It has been in operation for three months, and in those three months our bill from Ameren went from $2,500 a month to $28 for the meter charge.
We carried over enough unused energy to let us go a full month with no power generation and still not receive an electric bill. AES was with us all the way and handled any problems we had with construction in a fair and professional manner.
Our solar field is south of our building, and our address is 606 Plum St.
