Mike Hickey
We installed a 62K solar field at the Knights of Columbus in Murphysboro. In the first three months, our bill from Ameren went from $2,500 a month to $28 for the meter charge.
We carried over enough unused energy to go a full month without power generation and still not receive an electric bill. AES was with us all the way and handled every issue fairly and professionally.
